Load & Current

kW, kVA, kVAR and line current for single- and three-phase loads.

Used in L04–L06

Motor Full-Load Current

Varies by standard

Motor FLC and circuit sizing basis: calculated (IEC/IS) or NEC Table 430.250.

Used in L05, L52

Transformer Sizing

Varies by standard

Required kVA from demand, growth and loading, then the next standard rating.

Used in L17

Transformer Fault Level

Bolted three-phase fault current at the LV terminals from kVA and impedance.

Used in L63

Voltage Drop

Varies by standard

ΔV and % drop against the profile's limits, with the smallest size that complies.

Used in L27

Cable Sizing

Varies by standard

Full selection workflow: protective device, derated ampacity, voltage drop and short-circuit withstand.

Used in L24–L29

Motor Feeder

Varies by standard

FLC, starter, overload and short-circuit protection, and a cable checked for running and starting voltage drop.

Used in L58–L60

Generator Sizing

Varies by standard

Running-load and motor-starting checks, with an estimated transient voltage dip.

Used in L18

UPS & Battery Sizing

UPS rating from both the kVA and kW limits, plus first-pass battery capacity.

Used in L19

Power Factor Correction

Varies by standard

Capacitor kVAR for a PF target, harmonic resonance check, and capacitor switchgear sizing.

Used in L69–L70

Earthing

Varies by standard

Protective conductor size, earth-electrode resistance, TT limits and final-circuit disconnection length.

Used in L72–L75

Cable Tray Fill

Varies by standard

Tray fill by area (IEC / IS practice) or NEC 392.22 rules, with the minimum tray width.

Used in L88

Short-Circuit Study

Varies by standard

Impedance-method fault current at the LV bus and at a cable end, with motor contribution and peak current.

Used in L61–L65

Protection Coordination

Plot two devices' LSI time-current curves on log-log axes and find the selectivity limit.

Used in L46–L47

Load Schedule

Varies by standard

Enter loads by board: connected and maximum demand (C/I/S), PF combined correctly, incomer currents.

Used in L11–L16